MPS Installation Quick Start Guide
Step 1. Mounting the kiosk
The kiosk is the central point of the system and contains the operator touch panel and power connections. It needs to be firmly mounted in a suitable […]
Step 1. Mounting the kiosk
The kiosk is the central point of the system and contains the operator touch panel and power connections. It needs to be firmly mounted in a suitable […]
The following procedures must be carried out every time an MPS is installed in a new location.
These procedures must be performed to correctly install and align the scan head and define the […]
The Settings screen (figure 19) provides options for customising the MPS configuration.
Access this screen from the SETTINGS button on the Main screen. The ‘system’ password is required.
Figure 19 – […]
Introduction
When load status reporting is enabled, status values are reported for each measured load.
Load quantity status values indicate whether the bin is:
Load distribution status […]
This section describes basic operation of the MPS after installation and commissioning.
Starting up and shutting down
Use the power isolator switch on the front of the power box to power on […]
The following procedures must be carried out every time an LVS is installed in a new location.
These procedures must be performed to correctly install and align the scan head and define the […]
Introduction The Records screen (figure 28) displays measurement records.
Access is from the RECORDS button on the Main screen. The ‘system’ or ‘user’ password is required, depending on password settings.
Figure […]
The Settings screen (figure 14) provides options for customising the LVS configuration.
Access this screen from the SETTINGS button on the Main screen. The ‘system’ password is required.
Figure 14 – […]
The Vehicle Database screen displays details of any vehicle recorded in the database.
This section describes basic operation of the LVS after installation and commissioning.